top of page

It's all in the details

Writer's picture: Tim CarterTim Carter

At Lingfield College, the PAD (Performing Arts and Dining) project is taking shape with the key elements visibly forming.  Uprise Construction are diligently creating an impressive opening through the side of the 1970s building, with substantial temporary works, ready to operate as a new glazed focal point.

 

The acoustic ceiling, which will reduce and control the acoustic reverberation, is largely installed, while the mechanical equipment which will ensure multiple air changes an hour with minimal heat loss below is almost in place. 

 

Offsite the wall panelling and servery are being carefully crafted by Eren Hasan and his fantastic team at Catersales.  These components will come together to help serve the healthy, fresh food with Lingfield’s catering team diligently prepare each day.

 

We look forward to all of the pieces of this jigsaw coming together over the next couple of months as this project continues to come to life.







 

bottom of page